Case Study: High-Bay Logistics & Fulfillmentβ€’BS 5839-1:2025 Aligned

Eliminating High-Bay Blind Spots and Costly False Evacuations in a 350,000 sq ft Distribution Centre

Racking rising to 14.5 metres created ceiling thermal stratification, while VNA forklift dust triggered 2 to 3 false alarms per month. By tapping into 16 existing aisle CCTV feeds, FireVision eliminated false evacuations, cut verification time by 11 minutes, and saved Β£46,000 per quarter in lost picking labor.

Client
Tier-1 3PL Logistics Operator
Location
Northamptonshire Golden Triangle
Deployment
16 Racking & Loading Bay RTSP Feeds
False Alarm Drop
99.2% Nuisance Reduction
Operational Savings
Β£46,000 / Quarter (Recovered Picking)
CAM-11 HIGH-BAY AISLE 07 & MEZZANINE
138ms LATENCY
High-bay warehouse CCTV fire and smoke detection showing optical bounding box
SMOKE PLUME DETECTED: STRATIFIED EMBERS
CONFIDENCE: 97.8% β€’ CLASS: CONVECTION PLUME
MODEL: FIREVISION-1.5 (SPATIO-TEMPORAL)
Forensic Clip ID: #NN-LOGISTICS-AISLE07 β€’ Visual Verification Time: 00:00:03.8s
Action: Instant 5s Loop Pushed to Central Security Room
The Operational Challenge

The High-Ceiling Stratification Barrier & Lost Picking Hours

High-bay distribution centres face a physical dilemma: roof-level optical beams cannot 'see' early smouldering smoke trapped beneath temperature layers, while airborne forklift dust triggers false plant evacuations.

01

The Thermal Stratification Gap

Storage racking standing at 14.5 metres created a natural thermal barrier. Rising cool smoke from smouldering pallets cooled and stratified at 9 metres, never reaching the roof-level optical beam detectors until an open blaze developed.

02

Shift Disruption & SLA Breaches

Dust kicked up by fast-moving VNA forklifts frequently drifted into optical beam pathways, triggering 2 to 3 false evacuations monthly. Each evacuation cost 90 minutes of lost picking time across 120 shift workers, breaching dispatch SLAs.

03

Physical Inspection Constraints

Security staff required 8 to 12 minutes to physically navigate 40 racking aisles across 350,000 sq ft to verify alarm triggers, leaving operations paralyzed and delaying the fire brigade callout window during genuine anomalies.

The Technical Solution

Optical AI Line-of-Sight Across 14.5m Racking Aisles

Rather than installing expensive aspirating piping via scissor lifts, FireVision connected to existing security cameras to provide immediate visual intelligence straight to the security desk.

Optical Line-of-Sight Coverage

Integrated FireVision AI directly onto existing aisle-facing security cameras, monitoring the full vertical face of the racking from floor to ceiling (0m to 14.5m) with zero thermal blind spots.

Stratification Bypass (Direct Sight)

Visual Verification (BS 5839-1:2025)

When abnormal smoke dispersion or friction embers occur, the system delivers an instant 5-second video snippet to the Central Security Room, allowing visual verification within 15 seconds before sounding building alarms.

Under 15s Verification SLA

Mobile Evacuation App Integration

Deployed the companion FireVision Evacuation App for digital headcounts and dynamic muster point tracking across the 350,000 sq ft floor plan, reducing warden roll call time from 20 minutes to under 4 minutes.

Real-Time Digital Muster Roll
Audited Operational ROI

Measured Operational Impact Over 6 Months

Β£46k
Saved Per Quarter

Recovered picking labor and avoided dispatch penalty clauses within the first 90 days of operation.

Zero
Unplanned Evacuations

Completely eliminated false evacuations caused by warehouse dust clouds or forklift engine exhaust.

11 Min
Faster Verification

Instant 5-second video loop pushed to security desk vs. 8-12 minutes required for physical foot patrols.

16
Aisles Covered

Full racking protection achieved using existing CCTV cameras with zero scissor lift hire or wiring cost.

Verified Client Statement β€’ Tier-1 Logistics Hub
β€œIn a fulfillment centre running 24/7, halting the sorter for a false alarm costs thousands per minute. FireVision stopped the nuisance trips while giving us genuine line-of-sight protection right down the racking aisles where traditional beams were useless.”
Head of Facilities & Engineering
Tier-1 3PL Logistics Operator β€’ Northamptonshire Golden Triangle
350,000 sq ft Continuous Uptime
High-Bay Feasibility Assessment

Audit Your High-Bay Detection Coverage.

Verify whether thermal stratification is leaving your high racking unmonitored. Connect up to 5 warehouse feeds in under 15 minutes.

Zero hardware cost β€’ 15-min remote setup β€’ BS 5839-1:2025 compliant
Open Feasibility Booking Calendar
UK Cloud SovereignBS 5839-1:2025 VerificationSub-15s Incident LoopZero Scissor Lift Installation